home *** CD-ROM | disk | FTP | other *** search
/ Developer Source 9 / developer source - volume 9.iso / oracl / may96 / shalf101.gif < prev   
Graphics Interchange Format  |  1998-02-10  |  31.0 KB  |  340x312  |  8-bit (121 colors)
   ocr: FIGURE 1: This graph shows why establishing the minimum level of required precision is so important when characterizing your workload. Simply throwing more money into a capacity plan will not always increase the prediction precision. System Load versus Time Peok Load Heavy Lood Average Load Time